First Congregational Church, Nantucket, MA

Drawings and Specifications

12/26/2007

Addenda  
Addendum No. 1 8/21/2007
Addendum No. 2 8/29/2007

Change Orders   Description
Change Order #1 12/26/2007 Painting of the interior shutters.
     

Drawing Package All drawings are 11" X 17" Date
A1 Cover Sheet 8/8/2007
A2 Existing Photos - Elevations 8/8/2007
A3 Elevation - East 8/21/2007
A4 Elevation - North 8/21/2007
A5 Elevation - West 8/21/2007
A6 Elevation - South 8/21/2007
     
Breakdown of Base Bid and Alternates a = base bid, etc. 8/21/2007 (For Excel doc, hit this and it will download to your desktop)

Specification Package  
Section Date  
    All files are pdfs
Checklist for Bidders 8/10/2007 Checklist
Job Site Conditions 8/10/2007 Job Site
     
Table of Contents 8/10/2007 Table
00100 8/10/2007 Instructions
00200 8/10/2007 Advertise
00300 8/21/2007 Bid Form (For Word doc, hit this and it will download to your desktop)
00400 8/10/2007 Contractor Qualification Statement
00500   AIA 107 (Not on web)
00800 8/10/2007 Supplementary
01010 8/21/2007 Summary
01520 8/10/2007 Staging, Lifts and Access
02100 8/10/2007 Demolition
06200 8/10/2007 Architectural Carpentry
08600 8/10/2007 Wood Window Repairs
09910

12/26/2007

Painting
Secretary of the Interior Standards for Historic Preservation Projects   http://www.nps.gov/history/hps/tps/standguide/preserve/preserve_standards.htm